Break Seized Chain Pins Fast — No Torches. No Hammering.

Jammed sugar-mill conveyor chains halt production fast and seized pins won’t move under load.

Fast quotes. Faster pin removal.

Fast quotes. Faster pin removal.

Why Pins Seize in Sugar Mills

Sugar mills run hot, dirty, and abrasive, so pins seize fast under thermal cycling and corrosion. Jammed WH132 and WDH159 pins stop carriers immediately and force dangerous torch work. You need a safer, hydraulic way to break the pin loose and get the line moving now.

Why This Failure Happens

Bagasse fines, moisture, heat, and corrosion pack into WH132, WDH159, and WS-series joints until the pin galls against the bushing. Thermal cycling expands and contracts loaded links, tightening the interference fit. Load shocks during bagasse surges drive contamination deeper and lock the pin immobile.

Why Operators Choose Kingpin Breaker

Cuts downtime with fast hydraulic pin extraction

Eliminates torch work for safer breakdown repairs

Aligns squarely to prevent link and sidebar damage

Deploys anywhere with field-portable hydraulic setup

Handles WH132, WDH159, WS chains without modification

Built to Perform.

PIN LENGTH RANGE

2.25" – 7.8"

INCLUDES MULTI-CHAIN KIT

(2) Pin Cavities, (4) Pushpins, (5) Spacers

DIMENSIONS (Tool Body)

16.5" × 2.5" × 16"

PIN DIAMETER

1.125" and below

HYDRAULIC CYLINDER

15-ton Hand Pump (foot pedal available)

WEIGHT

28 lbs.

Why Maintenance Teams Trust Kingpin Breaker

Fast. Safe. Simple. Versatile.

Fast

Break even the most

stubborn chains in about

two minutes.

Safe

Reduce hand and back injuries — no hammers, torches, or channel locks.

Simple

Lightweight, intuitive design. Set up and service chains immediately.

Versatile

One tool for almost all chain sizes — fits in tight spaces with ease.

How it Works

From Setup to Break in Minutes.

STEP 1

Secure & Align

Secure the chain link and alignpushpin

STEP 1

Secure & Align

Secure the chain link and alignpushpin

STEP 1

Secure & Align

Secure the chain link and alignpushpin

STEP 1

Secure & Align

Secure the chain link and alignpushpin

STEP 2

Build Pressure

Pump until pressure builds (hand or foot pedal)

STEP 2

Build Pressure

Pump until pressure builds (hand or foot pedal)

STEP 2

Build Pressure

Pump until pressure builds (hand or foot pedal)

STEP 2

Build Pressure

Pump until pressure builds (hand or foot pedal)

STEP 3

Drive Out Pin

Drive out the pin cleanly — no shock or damage

STEP 3

Drive Out Pin

Drive out the pin cleanly — no shock or damage

STEP 3

Drive Out Pin

Drive out the pin cleanly — no shock or damage

STEP 3

Drive Out Pin

Drive out the pin cleanly — no shock or damage

STEP 4

Move & Repeat

Move to the next link and repeat

STEP 4

Move & Repeat

Move to the next link and repeat

STEP 4

Move & Repeat

Move to the next link and repeat

STEP 4

Move & Repeat

Move to the next link and repeat

Real Breakdown Scenarios We Fix

Bagasse-packed WH132 carrier chain with a pin frozen solid mid-shift

WDH159 elevator chain jammed after thermal expansion under high load

WS drag conveyor joint seized from corrosion during wet-mill operations

Cane-carrier chain immobilized by abrasive fines packed into link barrels

Return-side drag chain locked after bushing galling and zero pin movement

Request a Quote

Seized pin? Not for long.

Kingpin Breaker

Make stubborn pins tap out.

Contact

Email: cooper@kingpinbreaker.com

Phone: (262) 781-3870

Location

Wisconsin, USA